Green Wheel

Client: Roosevelt Middle School

Eugene, OR

Services Provided: Pre-Design, Design Development, Permitting, Construction

Project Managers: Sylvan Cambier, Andrew Cusack, Tim Kuzma (Mentor) Juli Brode

2008

Also part of the OTREC bike-shelter project series the Roosevelt Bike shelter project grew out of a need to provide a central sheltered area for children to park their bikes. The final design is a steel and wood structure located at the center of a group of u-shaped classroom buildings. In addition the team designed and installed new bike-racks that would increase safety.